Service description
What you need to know for decisions and execution
Service overview / 01
The right materials, to the right specification, on the site’s schedule
Fiberglass mesh, plaster and complementary components each have testable specifications. In this service, items are selected, checked and delivered to the site according to the project design, not just as “a roll of mesh”.

Process / 02
Five steps, from request to site delivery
Delivery can be staged in step with site progress.
- Register the requestItem list based on the takeoff or design specs
- Match specificationsFiber type, weight, opening, coating and environment
- Confirm and procureAnnounce available items and the delivery schedule
- Outbound controlInspect packaging and conformity before dispatch
- Site deliveryStaged dispatch aligned with the execution program
Deliverables / 03
What do you receive?

Fiberglass mesh
With the surface weight and opening size per project design.
Gypsum- or cement-based plaster
Matched to the substrate and site environment.
Complementary components
Galvanized angles, channels, screws and connectors.
Technical documents
Written specifications for archive and quality control.
Loading plan
A proposed delivery sequence aligned with the site.
Technical support
Answers to the crew’s questions on material use.
FAQ / 04
Common questions about this service
What is the minimum order quantity?
It depends on the item type and the project program; a supply framework is proposed for smaller projects too.
Is staged supply possible?
Yes; delivery can be staged with site progress so material does not sit unused on site.
How are item specifications verified?
Written specifications are announced before dispatch and the load is checked against them.
What if an item is unavailable on the market?
An equivalent substitute with acceptable specifications is proposed and announced for your approval before dispatch.


