Securing non-structural walls
A focus on wall mesh and FRCM strengthening when assessing design, material, and execution needs.
Novin Wallmesh, between drawings and the jobsite
Novin Wallmesh is a specialist practice focused on the seismic restraint of non-structural walls. Its stated scope includes design and calculations, material estimating, supply, training, supervision, and execution support.
A transparent introduction
This page reflects the organization information currently available. The exact founding year, official team size, and final client list are not presented as established claims until confirmed by the site owner.
A focus on wall mesh and FRCM strengthening when assessing design, material, and execution needs.
From receiving drawings through estimates, execution drawings, coordinated supply, and agreed execution checks.
A technical proposal must be assessed against the project documents and applicable rules. It does not replace the opinion of the project designer or supervising engineer.
Service chain
The exact sequence and scope of each stage are set after the documents are reviewed and the project terms are agreed.
Geographic coverage
The stated scope includes service delivery and supply throughout Iran. Dispatch availability, delivery time, and support conditions must be confirmed for each city before ordering.
City names are shown from the organization's current lists and do not by themselves confirm the details or contract scope of any project.
Because no public roster is available, this section describes roles without claiming names or staff numbers.
Team structure
The actual project team is set according to the contract scope and the building stage.
Reviewing drawings and turning project needs into executable details.
Coordinating items, quantities, and timing to the agreed specifications.
Aligning the execution crew with technical details and control points.
Following up questions and execution items within the selected service.
Technical documentation
A technical certificate must be reviewed together with the holder name, covered product, validity date, and the conditions written in the document. For a project decision, verify the current version and authenticity with the issuing authority.
Share the drawings and execution status so the review path and required documents can be defined.