Service description
What you need to know for decisions and execution
Service overview / 01
Wall-mesh installation you can control from day one
Wall-mesh quality is built in the details: uniform embedment, correct overlap and edge control. This service covers the whole execution path, from drawing coordination and substrate preparation to final handover and snagging.

Process / 02
Five steps, from a ready substrate to final handover
A mock-up before rollout becomes the agreed quality benchmark.
- Coordinate drawings and substrateCheck documents, access and wall condition
- PreparationRepair and level the substrate, arrange tools and scaffolding
- Mock-upAgree embedment, overlap and quality on a sample
- Staged executionProgress per drawing with control at each stage
- Handover and snaggingFinal inspection, correction and recorded handover
Deliverables / 03
What do you receive?

Execution per layout drawing
Path, direction and overlap matching the design documents.
Embedment control
Uniform seating of mesh in the fresh plaster layer.
Edge and opening control
Mesh continuity around doors, windows and corners.
Stage reports
Trackable progress and control-point status.
Snagging
Correction of reported items before handover.
Written handover
A handover record for the site’s next steps.
FAQ / 04
Common questions about this service
What condition must the substrate be in?
Repaired and plaster-ready; the substrate status is announced at the first visit along with how to reach it.
Do you work in occupied residential buildings?
Yes; the work program is staged around occupancy and ongoing activities.
Do you coordinate with the contractor and other trades?
The work sequence (MEP, finishing and others) is agreed in writing before starting.
Is there a minimum area to start?
No fixed minimum; scope and program are proposed based on drawings and the initial visit.