01 Analysis and detailing
Wall Mesh Design and Calculations
- Input: architectural and structural drawings
- Output: proposed layout and details
Seismic restraint for non-structural walls
Integrated design, supply, training and supervision that turn drawings into a clearer path to execution.
Conceptual image of the wall-mesh system; the final solution for each project is determined after reviewing its drawings.
Complete service chain
NW / FLOW 01—03
X: 04.12 / Y: 08.40
DETAIL / WM-02
01
02
03
Conceptual image created to illustrate the design process
WM / 02 Analysis through execution control
Novin Wall Mesh turns project drawings into an executable solution, a clear estimate and jobsite support.

SERVICE CONTROL / 01—05
Open each service to see its inputs, outputs and project role on one stage.
NWM / FULL CHAIN
DESIGN → SITE
01 / 05 Swipe to see more services←
FRAME / 01
01 Analysis and detailing
FRAME / 02
02 Coordinated selection
FRAME / 03
03 Staged execution
FRAME / 04
04 Jobsite control
FRAME / 05
05 Existing-condition review
Images on this stage are conceptual; exact project specifications are determined after document review.

Why wall mesh
The right solution is not merely lighter. It must be calculable, executable and controllable.
Review project drawingsEliminating much of the posts and beams reduces execution conflicts and dead load.
A distinct execution path is defined for new buildings, existing walls and strengthening projects.
The mesh and plaster must be selected to match the wall substrate and environmental conditions.
These counters are read directly from items published in this version; they are not commercial claims or confirmation of project execution.


Collaboration protocol / 01—05
Every stage has a clear deliverable so the next decision is made with sufficient information.
Architecture, structure and wall specifications are reviewed.
Strip layout, connection details and material quantities are defined.
Products suited to the project technical specifications are prepared.
The site crew learns the sequence and critical points of the work.
Staged inspections and reports expose issues before finishing work begins.
Conceptual image illustrating continuity between stages; exact project deliverables are defined after document review.
A selection from the published 1404 project list across different cities and scales.
EVIDENCE ROOM / 05
Explore collaboration experience, team structure and technical references in one continuous chapter, without fabricated logos or quotes.
VERIFIED
Collaboration framework
Inputs, responsibilities and expected outcomes are defined from the outset so technical decisions remain traceable.
Collaboration commitments
Open each commitment to view its details.
Received drawings and specifications are reviewed, while the design basis, limitations and expected deliverables remain defined before delivery.
Proposed items are based on drawings and takeoffs so later changes and their effect on quantities can be reviewed.
Execution questions and observed issues are recorded stage by stage so response and correction status stays clear to the project team.
Project operating model
The team structure is shaped around the roles each project requires.
DESIGN → SITE → SUPPORT

Responsible for reviewing project inputs, designing the system, preparing material takeoffs and translating the design into execution-ready details.
Responsible for training crews, installing a sample, inspecting critical stages and following up on the resolution of execution issues.
Responsible for matching product specifications to the design, planning supply and responding to technical questions about orders.
Profiles and photographs of real team members will be added only after verification and publication consent.

Strategic partner network
Logos of the organizations we design, supply and build with.
National Iranian Oil Company
Oil Engineering & Development Co.
Naft va Gaz Eista Co.
Fastwall (Foolad Tabarestan – Amol)
Monolith Co.
Arkan Sazeh Co.
Mashhad Housing Foundation
Khavaran Housing Development Co.
IRIB Staff Housing Cooperative
Tehran ICT Staff Housing Cooperative
Sima Staff Housing Cooperative
Dejdis Co.
Sabir International Co.
Lean Tower Co.
Mahiar Alborz Metal Industries
Logo 1 of 15

Brief answers for an initial decision. A precise response follows after drawings are received.
All questionsWall mesh is a method for out-of-plane restraint of non-structural walls that uses a glass-fiber mesh and a compatible plaster. The arrangement, strip widths and connection details must be designed for the drawings and conditions of each project.
In many applications, wall mesh can eliminate vertical restraints, horizontal beams, much of the steelwork, welding and bed-joint reinforcement. Whether it can be used in a specific project must be assessed through that project’s design and applicable requirements.
The system can be considered for concrete-block, clay-block and AAC walls, in new-build or existing projects. Substrate preparation and plaster selection are important for every wall type.
Yes. One execution advantage of this method is that it can be installed after wall construction and, in some projects, over an existing wall. The substrate condition, cracking, moisture and connection details must be checked before work begins.
Pricing depends on wall area and geometry, mesh and plaster type and quantity, supplementary components, height and access, project city, and the design or execution scope. A firm price can be established only after reviewing the project information and issuing a quotation.
Architectural and structural drawings, block type and thickness, wall heights and lengths, opening locations, project location and the current work stage are the main inputs. The designer may request other documents depending on the project.

Practical content for clients, designers, supervisors and execution teams.
Comprehensive guide to examining the standard wall mesh price from the Ministry of Roads and Urban Development, cost factor analysis, comparison with traditional wall posts, and direct purchase from Novin Wall Mesh Department.
A comprehensive review of the impact of the Novin Wall Mesh Department brand on wall mesh prices and the factors influencing the cost of non-structural wall retrofitting using fiberglass mesh and standard plaster.
Specialized review of material consumption rates per square meter of wall mesh plaster. Guide to calculating fiberglass mesh, gypsum, and cement plaster for project cost optimization.

Start a technical review
Submit the initial project information. The technical team will contact you to receive the drawings and complete the review.

For an initial estimate, share your project details with the Novin Wall Mesh technical team.